Home remodeling in San Antonio.

OneWay Remodel takes whole home remodels in San Antonio and Bulverde: layout changes, load-bearing wall removals, kitchens, primary suites, closets, built-ins and finish carpentry, all under one licensed contractor. A full home remodel in Terrell Hills was finished in 6 weeks. Licensed and insured.

Open plan kitchen and living room in a Hollywood Park home after a whole home remodel by OneWay Remodel
Real OneWay job

Hollywood Park

Kitchen and living rebuilt as one room

Hollywood Park kitchen after a whole home remodel: white shaker cabinets, a long quartz island with stools and three glass pendants Stone Oak living room before the remodel, with the kitchen and dining room closed off behind three arched openings and columns The same Stone Oak wall mid remodel, framing opened up and two crew on ladders setting the new load bearing beam Stone Oak dining and living room after the load bearing wall came out, one wide opening under the new cased beam where the arches were Terrell Hills kitchen after a whole home remodel: white shaker cabinets, a farmhouse sink under the window, a stainless fridge and dark wood floors Open plan living and dining after a whole home remodel Full wall of built in shelving in a Terrell Hills whole home remodel Restored Hill Country farmhouse kitchen with sage green cabinets and open wood shelving Load bearing wall stripped to the studs during a whole home remodel Laundry room with penny tile flooring and custom cabinetry Farmhouse stripped back to sheathing and supported on shoring
Hollywood Park, the kitchen after the wall came out
6Weeks, Terrell Hills
1Contractor, no handoffs
25Years in the trade
Licensedand insured

How a whole home job runs

Four things that decide whether it lands on time.

Every one of these is a place other projects lose weeks, and none of them are visible in a finished-photo gallery.

Finished opening in a Stone Oak home with the new beam cased in, the stone fireplace and living room now in view from the dining table
Structure

The wall is usually the whole project

Houses built here through the eighties and nineties walled the kitchen off from everything else. Taking that wall out is what actually changes how the house feels, and it is structural: a header, a permit, a framing inspection.

That is permitted and inspected work, which is why it belongs with a licensed contractor: a header sized for the span it is carrying, a framing inspection, and the ceiling line put back so you cannot tell where the wall used to be.

Comfort farmhouse with its siding stripped back to the sheathing and ladders up during structural work
Permits

What the process actually looks like

Structural work is permitted through the City of San Antonio. Expect a framing inspection, mechanical, electrical and plumbing rough-in inspections, and a final. For a load-bearing change the inspector may require an engineer’s report at framing, which is a decision made in the field.

Permits run six months and extend while work is progressing. We pull them rather than asking you to.

Finished kitchen and dining space in a Terrell Hills whole home remodel
Sequence

No handoffs is the whole advantage

Whole home remodels go wrong at the handoffs, where one trade finishes and blames the next. We do not have any. The same contractor pulls the permit, takes the wall out, sets the cabinetry and hangs the trim.

Between one and eight people work a job. Hayne is one of them, and he does not run two large projects at once.

Powder room with wainscot panelling and penny tile flooring
Finish

Running trim through the whole house

The tell of a patched remodel is trim that changes profile at a doorway. Running flooring, casing and crown through the whole house is what stops a project reading as three separate jobs stitched together.

Recent whole home projects

Whole home work around San Antonio and the Hill Country.

Three houses taken on room by room with one crew running the whole job, rather than a series of trades handing off to each other.

What a whole home job usually includes

  • Layout changes and load-bearing wall removals with permits pulled and inspections passed.
  • The kitchen, built to the new layout rather than dropped into the old one.
  • Primary suite taken as one project: bedroom, closet and bath together.
  • Flooring, trim and doors run through the whole house so nothing reads as patched.
  • Built-ins and millwork, which is where a remodel stops looking like a flip.

Six weeks in Terrell Hills

A full home remodel in Terrell Hills was finished in 6 weeks, and the homeowners said so publicly. Whole home timelines depend entirely on scope, so treat that as a benchmark rather than a quote.

What it demonstrates is what happens when nobody is waiting on a subcontractor’s calendar.

Living through it

For a whole home remodel you will usually need to be out for at least part of it. We will tell you which weeks are genuinely livable at the walkthrough rather than after you have signed, because that answer changes people’s plans and it is not ours to be vague about.

FAQs

Frequently asked questions.

The questions we get asked most, answered the way we would answer them on the phone.

1.

How long does a whole home remodel take?

It depends on scope. A full home remodel in Terrell Hills was finished in 6 weeks. A kitchen inside a larger project runs 2 to 4 weeks, or 7 to 10 if the cabinets are custom built, and a primary suite bathroom 3 to 5 weeks.

2.

Do you pull the permits?

Yes. Structural and layout work is permitted through the City of San Antonio under his contractor license, with framing, rough-in and final inspections. We handle it rather than asking you to.

3.

Will I need an engineer's report?

Sometimes. For a load-bearing change the inspector may require an engineer's report at the framing inspection, and that call is made in the field. We budget for the possibility rather than treating it as a surprise.

4.

Can you remove a load-bearing wall?

Yes. It is routine on the houses we work in. It means a header, a permit and a framing inspection, all of which are handled under our license.

5.

Do we have to move out?

For a whole home remodel, usually for at least part of it. We will tell you which weeks are livable at the walkthrough rather than afterwards.

6.

Why do so many remodels run over?

Handoffs. One trade finishes late, the next cannot start, and nobody owns the gap. One contractor doing the structure, the cabinetry and the finish work removes the gaps rather than managing them.

7.

How long is a city permit valid?

Six months, and it can be extended for a further six as long as work is genuinely progressing. That is rarely a constraint on a project of this size, but it is worth knowing.

8.

Is there a minimum project size?

We take whole rooms and whole homes rather than single-fixture jobs, and a whole home remodel is the biggest thing we do. If the scope turns out to be smaller than you thought, we will say so.

Related work

A whole home remodel usually contains a kitchen, a primary suite, closets, built-ins and millwork. Same crew for all of it.

Thinking about the whole house?

Call and walk us through it. If the scope is bigger than the budget, we will say so on the phone rather than three weeks in.

The consultation is free, and there is no travel charge anywhere we work.