OneWay Remodel

Bexar County, Texas

Remodeling contractor in Terrell Hills, TX.

Terrell Hills was laid out in 1919 and became its own city in 1939, and most of it is still the original housing. The median house here was built in 1957, and six in ten predate 1960. That means plaster walls, wiring and plumbing that may be original, rooms that were never quite square, and a kitchen built to be closed off from the rest of the house. Remodeling here means opening walls carefully and finding out what the last three owners did before you.

OneWay Remodel builds whole home remodels, custom kitchens, built-ins, baths and closets for Terrell Hills homeowners. Our shop is in Bulverde, about 22 miles north, roughly half an hour down 281 outside rush hour, and Terrell Hills is inside our normal service area with no travel charge. Owner Hayne Wolmarans supervises every job. Licensed and insured.

Terrell Hills living room after a whole home remodel by OneWay Remodel: refinished oak floors, plantation shutters and a full wall of white built-ins, with the edge of the bar counter on the right
Real OneWay job

A Terrell Hills whole home

Built-ins wall to wall, finished in six weeks

The Terrell Hills kitchen before remodeling, looking down the galley from the stainless fridge to the window over the sink, with cream raised panel cabinets, crown molding and a travertine floor laid on the diagonal Terrell Hills laundry room with white upper cabinets, a hanging rail over the washer and dryer, plantation shutters on the window and a white hexagon mosaic floor with black dots Terrell Hills powder bath seen from the doorway, with white board and batten wainscot, gray brown walls above, a white toilet and the edge of a wall hung basin on a white hexagon mosaic floor with black dots A second Terrell Hills kitchen before remodeling, empty, with a dark green island on turned legs, a tall green pantry cabinet, black counters, white uppers and a gray tile floor Terrell Hills kitchen with white shaker cabinets to the ceiling, a granite topped island, black perimeter counters, white subway tile, a four light linear chandelier and dark wood floors The same Terrell Hills kitchen showing a wall of tall white pantry cabinets, dark floating wood shelves on white subway tile and the granite island in the foreground
Before: the kitchen as we found it, from the fridge end
22Miles from our shop
1957Median year homes built
6Weeks, this whole home
32Five-star reviews

A Terrell Hills whole home

Six weeks, five rooms, one crew.

The kitchen, a wall of built-ins, a bar, the laundry and a powder bath, in a house from the era when Terrell Hills was built. Finished in six weeks on the city's weekdays-only hours, and the homeowners said so publicly.

The Terrell Hills kitchen before: cream raised panel cabinets, crown molding, a gas cooktop against a stainless splash, the sink under a single window and a travertine floor laid on the diagonal
Before

Cream cabinets, travertine, a clock over the window

The kitchen as we found it. Cream raised panel doors, crown molding, a cooktop against a stainless splash, the sink under the one window and travertine laid on the diagonal. Nothing wrong with any of it when it went in. It was dark, it was closed, and it had been there a long time.

The finished Terrell Hills kitchen: white shaker cabinets, gray counters, white subway tile, a stainless hood over the cooktop, a double wall oven in its own tall cabinet, a farmhouse sink under the window and dark wood floors
After

White shaker, wood floors, the sink still under the window

White shaker doors, gray counters and white subway tile up to the uppers. The travertine came out and a dark wood floor went in. A farmhouse sink sits under the same window, a double wall oven stands in its own tall cabinet, and a stainless hood replaced the splash behind the cooktop. Same room, and it no longer looks like it is trying to hide.

Terrell Hills bar wall with lit glass front uppers, a white beadboard back panel, gray quartz counter, drawer stacks, an ice maker and a beverage fridge
The bar

Glass uppers, lit from inside, a beverage fridge below

Glass front uppers with lighting behind them, a beadboard back panel, gray quartz on the counter, an ice maker and a beverage fridge under it with drawer stacks either side. Built to the same lines and the same paint as the wall of built-ins in the living room, the one at the top of this page, so the two read as one job rather than two purchases. That wall was scribed to the plaster it sits on, which is why it looks original.

Terrell Hills powder bath with white board and batten to chair rail height, gray brown paint above, a wall hung basin with a brass tap, a brass two light sconce and a white hexagon mosaic floor with black dots
Powder bath

Board and batten, brass, a floor from the right decade

Board and batten to chair rail height, painted white, with a gray brown wall above it. A wall hung basin with a brass tap, a brass two light sconce, and a white hexagon mosaic floor with black dots, which is the floor this house would have had in the first place. The smallest room in the job, built to the same standard as the biggest.

What is different about working in Terrell Hills

Terrell Hills is its own city inside San Antonio, with its own permit office, its own residential design standards and the strictest working hours of anywhere we go. A remodel here runs on a five-day week, and the schedule is written that way from the start.

Weekdays only, 7 am to 6 pm

Construction in Terrell Hills is permitted on weekdays between 7 am and 6 pm. No Saturdays, no Sundays, no city holidays. That is not a problem, it is arithmetic: a job that would take five weeks somewhere else is scheduled as five weeks of weekdays here, and the Monday after a holiday is a Monday. We would rather tell you that before you sign than explain it in week three.

The dumpster is planned before demo

Dumpsters, stockpiled material and portable toilets count as a nuisance in Terrell Hills if they can be seen from the street or sit within 15 feet of a property line, unless they are screened, and the city gives 72 hours to put it right once it issues notice. So where the dumpster goes is decided on the first walk through, not on the morning the demo crew arrives.

Permits and inspections

Almost any real kitchen or bath remodel needs a permit here; only painting, decorating and very small jobs are exempt. The city runs permits through its online system, wants to see a contractor license it recognizes before it issues one, and books inspections by 4 pm for the next business day. Its own residential design standards apply to the plans. We handle all of it under our license.

What a 1950s house gives you

Plaster rather than drywall, wiring and plumbing that may be original, framing that has moved a little in seventy years, and a kitchen that was designed to be out of sight. Opening those walls is careful work, and the first thing you find is what the previous owners did. The six-week whole home on this page is the honest benchmark for what it looks like when it goes well.

What we build in Terrell Hills

All five, same crew.

Everything we do in San Antonio we do in Terrell Hills. Same people, same timelines, no travel fee.

FAQs

Frequently asked questions.

What Terrell Hills homeowners ask us most, answered the way we would answer on the phone.

1.

Do you charge a travel fee for Terrell Hills?

No. We are not around the corner, and we will not pretend to be: our shop is in Bulverde, about 22 miles north, roughly half an hour down 281 outside rush hour. Terrell Hills is inside our normal service area and the drive is ours, not yours.

2.

Have you worked in Terrell Hills before?

Yes. The whole home on this page is a Terrell Hills job: the kitchen, a full wall of built-ins, a bar wall, the laundry and a powder bath, finished in six weeks, and the homeowners said so publicly. The white kitchen with the granite island at the end of the gallery is a separate Terrell Hills kitchen.

3.

Can the crew work on Saturdays in Terrell Hills?

No. Terrell Hills only permits construction on weekdays between 7 am and 6 pm, with no weekends and no city holidays. We build the schedule on a five-day week from the start, so the date you are given already allows for it.

4.

Where will the dumpster go?

We decide that on the first visit, not on demo day. In Terrell Hills a dumpster, a pile of material or a portable toilet counts as a nuisance if it can be seen from the street or sits within 15 feet of a property line, unless it is screened, and the city gives 72 hours to fix it once it issues notice. On a tight lot that is a real planning question.

5.

My house was built in the fifties. What should I expect?

Plaster rather than drywall, wiring and plumbing that may be original, rooms and openings that were never quite square, and a kitchen designed to be out of sight. We open walls carefully, price what we can see, and tell you plainly what we cannot see until the wall is open. Most of Terrell Hills is this age, and it is good work.

6.

How long will it take?

A kitchen takes 2 to 4 weeks with the cabinets ordered in, or 7 to 10 weeks when we build them in the shop. A whole home depends on scope; the one on this page took six weeks, on a Terrell Hills five-day week, and that is a benchmark rather than a quote. For what a kitchen costs, see our kitchen cost guide.

7.

Will built-ins fit a wall that is not straight?

Yes. That is what scribing is for. The wall of built-ins on this page was measured and cut to the wall it sits on, and the reason it looks original is that every edge was scribed to the surface beside it.

Nearby

We also work in Hollywood Park, Universal City, Schertz, Stone OakFair Oaks Ranch, Bulverde, and across San Antonio. The work on this page is whole home remodeling, built-in cabinetry and kitchen remodeling. The full list of towns is on our areas served page.

Thinking about a Terrell Hills project?

Call and you will speak to Hayne or someone who has been on his crew. If we are not the right fit, we will say so on the phone.

The consultation is free, and there is no travel charge anywhere we work.