OneWay RemodelOneWay Remodel

San Antonio & Bulverde

Kitchen remodeling in San Antonio.

OneWay Remodel builds full custom kitchens in San Antonio and Bulverde, finished in 2 to 4 weeks rather than the 3 to 4 months a showroom quotes. Cabinets are cut to your kitchen’s real dimensions and scribed to walls that are rarely plumb. Owner Hayne Wolmarans supervises every job. Licensed RBC-22-01411.

Charcoal kitchen cabinets under a stained wood range hood in a Fair Oaks Ranch home built by OneWay Remodel
Real OneWay job

Fair Oaks Ranch

Charcoal cabinetry, stained wood hood, built and installed by our own crew

Charcoal kitchen cabinets under a stained wood range hood with brass hardware White kitchen with a waterfall stone island and a cluster of pendant lights Navy kitchen cabinets with a white quartz island and a barn door pantry White shaker kitchen with a grey blue island and stainless appliances Kitchen with a wood wrapped range hood, quartz island and farmhouse sink Kitchen island with a built in wine refrigerator and stone counter Schertz kitchen with blue grey cabinets, white quartz and exposed cedar beams Kitchen run with heavy veined stone counters and white cabinetry
Fair Oaks Ranch, charcoal and wood
2-4Weeks, start to finish
25Years in the trade
32Five-star reviews
1-8People on a job

How we build a kitchen

Four things that decide how it turns out.

None of this is visible when the job is done, which is exactly why it is worth asking about before you sign anything.

Detail of cabinetry scribed tightly to a wall
The floor is not level

We build to the house you have, not the drawing

San Antonio sits on expansive clay. It swells when it rains and shrinks when it does not, and our rainfall swings hard between the two. That is why doors stick, tile cracks, floors run out of level and gaps open at the trim in houses here.

In practice that means a cabinet run is shimmed and scribed to the floor and wall it actually meets. A factory box set on an uneven floor either rocks or gets packed out with filler. Ours get cut to fit.

Load bearing wall stripped to the studs during a kitchen remodel
Layout

Taking the wall out is usually the whole job

Houses built here through the eighties and nineties walled the kitchen off from everything else. Opening it up is the change that actually alters how the house feels, and it is structural work: a header, a permit, and a framing inspection.

We pull the permit rather than asking you to.

Pull out pantry storage inside a custom kitchen cabinet
Cabinetry

Built here, not ordered and waited on

The reason a showroom quotes 3 to 4 months is the factory lead time. We build your cabinets, so the schedule is ours to keep and the sizes are yours rather than the catalog’s.

No stock boxes, no filler strips, and the same crew that built them hangs them.

Hand built knotty cedar range hood above a cooktop
Finish

The part people notice without knowing why

Range hoods, crown, panelled ends and toe kicks are finish carpentry, which is the trade Hayne came up in. It is the difference between a kitchen that looks built and one that looks assembled.

Recent kitchens

Kitchens we have built around San Antonio.

Every one of these was built and installed by the same crew. Where a job is close to home for you, it is worth asking to see it in person.

What a kitchen remodel actually involves here

Demolition, structural work if a wall is moving, plumbing and electrical rough-in, inspection, cabinetry, counters templated after the cabinets are set, tile, flooring and finish carpentry. Two to four weeks for a full custom kitchen.

The sequence matters more than any single step. Counters get templated after the cabinets are in, not before, so the reveal and the sink cutout are right the first time. Tile goes down after the rough-in passes, not before, so nothing gets opened back up.

Permits and inspections

Structural work needs a permit from the City of San Antonio. Expect a framing inspection, mechanical, electrical and plumbing rough-in inspections, and a final. For a load-bearing change the inspector may ask for an engineer’s report at the framing stage, which is a call made in the field. Permits run six months and can be extended while work is progressing.

What we will not take

Cabinet painting on its own, refacing, countertop-only work and backsplash-only jobs. Those are legitimate businesses. They are just not this one, and we would rather say so on the phone than three weeks in.

FAQs

Frequently asked questions.

The questions we get asked most, answered the way we would answer them on the phone.

1.

How long does a kitchen remodel take in San Antonio?

Two to four weeks for a full custom kitchen, from demolition to final walkthrough. We build the cabinets rather than ordering them, which removes the factory lead time that pushes showroom projects out to three or four months.

2.

Why do my cabinet doors and drawers go out of alignment over time?

Usually the slab, not the cabinetry. San Antonio sits on expansive clay that swells when it rains and shrinks in drought, and the house moves with it. That is the same reason doors stick and tile cracks here. We hang and scribe cabinetry expecting that movement rather than pretending the floor is flat.

3.

Do I need a permit to remove a wall between my kitchen and living room?

Yes, if the wall is load-bearing, and in most San Antonio homes of that era it is. The work is permitted through the city, inspected at framing, and the inspector may require an engineer's report for the framing inspection. We pull the permit and manage the inspections.

4.

Can you match the new kitchen to trim in the rest of the house?

Yes. Matching an existing profile is ordinary finish carpentry, and it is the difference between a kitchen that reads as original to the house and one that reads as bolted on.

5.

What happens to my counters if the house shifts?

Stone counters do not flex, so what usually shows is a hairline at the backsplash or a seam. Building the cabinet run dead level and mechanically fastened, rather than resting on an uneven floor, is what keeps that from opening up.

6.

Do you handle appliances, plumbing and electrical?

Yes. Rough-in is coordinated before anything closes up and inspected before tile goes down. We build the cabinetry around the appliances you have actually chosen, not around standard openings.

7.

Will I be without a kitchen for the whole project?

Effectively yes for most of the two to four weeks. We will tell you at the walkthrough which weeks are the worst so you can plan around them, rather than letting you find out.

8.

Do you work outside San Antonio?

Yes. Bulverde, Boerne, Spring Branch, Schertz and Universal City are inside our normal service area with no travel surcharge.

Related work

Cabinets come out of the same shop as our custom cabinetry, and the hoods, trim and panelling are finish carpentry. Kitchens are often part of a whole home remodel, with the closets and primary suite following.

Thinking about the kitchen?

Call and you will speak to Hayne or someone who has been on his crew. If your project is not a fit, we will say so on the phone.

The consultation is free, and there is no travel charge anywhere we work.