San Antonio & Bulverde
OneWay Remodel remodels kitchens in San Antonio and Bulverde in 2 to 4 weeks for most jobs, using quality ready-to-assemble cabinets, or 7 to 10 weeks when you want cabinets built for the room in our shop. Either way it is against the 3 to 4 months a showroom quotes. Owner Hayne Wolmarans supervises every job. Licensed and insured.
Fair Oaks Ranch
Charcoal cabinetry under a stained wood hood, installed by our own crew
How we build a kitchen
None of this is visible when the job is done, which is exactly why it is worth asking about before you sign anything.

Floors and walls here are rarely level or plumb, and a cabinet run set to the drawing instead of the room shows it: the gap at the top is never the gap at the bottom.
We measure the run in the room and scribe it to the floor and the wall it actually meets, which is why the line stays tight.

Houses built here through the eighties and nineties walled the kitchen off from everything else. Opening it up is the change that actually alters how the house feels, and it is structural work: a header, a permit, and a framing inspection.
We pull the permit rather than asking you to.

Most of our kitchens use quality ready-to-assemble cabinets. They ship flat and we assemble them, so there is no factory queue, and that is why most kitchens finish in 2 to 4 weeks instead of the 3 to 4 months a showroom quotes.
When you want cabinets built for the room, Hayne builds them in his shop. That takes 7 to 10 weeks. Either way the same crew installs them, with Hayne on the job.

Range hoods, crown, panelled ends and toe kicks are finish carpentry, which is the trade Hayne came up in. It is the difference between a kitchen that looks built and one that looks assembled.
Recent kitchens
Every one of these was built and installed by the same crew. Where a job is close to home for you, it is worth asking to see it in person.

Charcoal cabinets under a stained wood range hood, with wine storage built into the end of the island.
See the work
Navy cabinetry run wall to wall, with a white quartz island and a barn door to the pantry.
See the work
White shaker cabinets taken to the ceiling, granite island, and a brick backsplash on dark counters.
See the work
Blue gray cabinetry with cedar beams overhead and a knotty cedar hood built on site.
Remodeling in Schertz
Stained wood cabinets around a stone faced island, finished to suit a Hill Country house.
Remodeling in Boerne
Opened into the living space by taking a wall out, with a wood wrapped hood as the one heavy element.
See the workDemolition, structural work if a wall is moving, plumbing and electrical rough-in, inspection, cabinetry, counters templated after the cabinets are set, tile, flooring and finish carpentry. Two to four weeks for most kitchens, seven to ten when the cabinets are built in our shop.
The sequence matters more than any single step. Counters get templated after the cabinets are in, not before, so the reveal and the sink cutout are right the first time. Tile goes down after the rough-in passes, not before, so nothing gets opened back up.
Structural work needs a permit from the City of San Antonio. Expect a framing inspection, mechanical, electrical and plumbing rough-in inspections, and a final. For a load-bearing change the inspector may ask for an engineer’s report at the framing stage, which is a call made in the field. Permits run six months and can be extended while work is progressing.
Cabinet painting on its own, refacing, countertop-only work and backsplash-only jobs. Those are legitimate businesses. They are just not this one, and we would rather say so on the phone than three weeks in.
FAQs
The questions we get asked most, answered the way we would answer them on the phone.
Most kitchens take two to four weeks from demolition to final walkthrough. Most use quality ready-to-assemble cabinets, which skip the factory queue that pushes showroom projects out to three or four months. If you want cabinets built for the room in our shop, plan on seven to ten weeks.
It depends mainly on three things: how many cabinet boxes the room needs, whether any plumbing or electrical has to move, and what goes on the counters. Labor stays roughly the same from one kitchen to the next, so the cabinets are the line that moves the number. We put real ranges from our own jobs, and the reason published San Antonio estimates disagree so wildly, in our guide to what a kitchen costs in San Antonio.
Usually the box and the hardware rather than the house. Particle board is the cheapest way to build a cabinet box, and it swells if it ever gets damp, which pulls doors and drawers out of line. Inexpensive drawer glides and hinges do the rest over a few years of daily use.
Yes, if the wall is load-bearing, and in most San Antonio homes of that era it is. The work is permitted through the city, inspected at framing, and the inspector may require an engineer's report for the framing inspection. We pull the permit and manage the inspections.
In a strict order, and keeping to it is most of what stops damage. Planning and selections first, then demolition, then any plumbing and electrical that has to move, then framing and drywall, then cabinets, then counters templated once the cabinets are in, then tile and flooring, then appliances and fixtures. Painting and touch ups come last so nothing already finished gets marked.
Three things, in the order we see them. Choosing on looks before working out how the room actually gets used every day. Losing clearance, so two people cannot pass or a door cannot open fully. And ordering cabinets before the appliances are chosen, which is the expensive one, because the opening has to suit the appliance rather than the other way round.
Yes. Rough-in is coordinated before anything closes up and inspected before tile goes down. We plan the cabinet run around the appliances you have actually chosen, not around standard openings.
Effectively yes for most of it. We will tell you at the walkthrough which weeks are the worst so you can plan around them, rather than letting you find out.
Yes. Fair Oaks Ranch, Hollywood Park, Terrell Hills, Bulverde, Boerne, Spring Branch, Schertz and Universal City are inside our normal service area with no travel surcharge.
When a kitchen calls for cabinets built for the room, they come out of the same shop as our custom cabinetry, and the hoods, trim and panelling are finish carpentry. Kitchens are often part of a whole home remodel, with the closets and primary suite following.
Call and you will speak to Hayne or someone who has been on his crew. If your project is not a fit, we will say so on the phone.
The consultation is free, and there is no travel charge anywhere we work.