OneWay Remodel

San Antonio & Bulverde

What a kitchen actually costs in San Antonio.

Most kitchens we build in San Antonio and Bulverde land between $31,500 and $138,000. Where yours falls inside that comes down to three things: how many cabinet boxes you need, whether anything moves, and what goes on top.

That is the short answer. The rest of this page is the long one, written by the carpenter who builds them rather than by someone estimating from a spreadsheet.

Hayne Wolmarans, ownerNovember 2026

Why nobody can give you a straight answer

Seven sources, one city, one month.

Before you read another cost guide, look at what San Antonio remodelers and the big listing sites were publishing for the same job in November 2026.

Source What they say a San Antonio kitchen costs
Thumbtack Average of $12,961
thefatbook.com $28,054 for a standard remodel
A local contractor $15,000 to $40,000
A kitchen and bath shop $10,000 to $20,000 cosmetic, $25,000 to $50,000 mid, $50,000 and up full custom
Another kitchen and bath shop $30,000 to $100,000 and up
realcostiq.com $63,973 typical, on a range of $9,139 to $118,807
A local home builder $75,000 to $125,000

Same city. Same month. The low end of one is $12,961 and the high end of another is $125,000.

Nearly ten times the spread for what is supposedly the same room.

They are not all lying. They are describing completely different jobs and calling them all a kitchen remodel. One is counting a refinish and new counters. Another is counting a gut with custom cabinetry and a moved wall. Most never say which.

So a homeowner reads seven pages, comes away with a number somewhere between thirteen and a hundred and twenty five thousand dollars, and is no better informed than before they started.

The fix is not another average. It is telling you what was physically in the kitchen that produced the number.

What the money buys

Three real kitchens, and what was in each.

These are not tiers off a price list. They are the three shapes almost every kitchen job takes, with what each one actually involved.

01

The layout stays put

$31,500 to $48,000

Timeline
2 to 3 weeks
What was in it
Fifteen to thirty boxes, new countertops and a new sink, new backsplash, under cabinet lighting, outlets and switches updated. The appliances stayed and so did the floor.

Nothing moves. Sink, range and fridge stay where they are, so no plumbing or electrical reroute. It is where the money goes furthest.

02

Something moves

$42,500 to $75,000

Timeline
3 to 4 weeks
What was in it
A wall out to open the kitchen to the living space. Concrete chipped to run power, water and drain to a new island. Fridge relocated, new ceiling and under cabinet lighting, a vent hood built for the room, new appliances, new tile floor and backsplash, twenty to thirty nine boxes, all new pulls, then drywall repair and paint.

A wall comes out, or an island goes in, or the sink moves to the window. The moment plumbing or electrical has to travel, you add trades, inspections and time.

03

Down to the studs, custom cabinetry

$80,000 to $138,000

Timeline
7 to 10 weeks
What was in it
Cabinets built for the room, which on a job like this is forty to fifty percent of the budget on its own. Complete custom layout, new electrical, plumbing moved, soffits removed, floor to ceiling cabinetry, a hide away door through to a butler's pantry, custom size cooktop, a 48 to 72 inch fridge, pot filler over the stove, farmhouse sink, new tile floor and backsplash, under cabinet lighting, then drywall repair and paint.

Cabinets built for the room rather than ordered to fit it. This is the work the shop exists for.

Every one of those is a real range from real jobs, not a bracket we made up. Your kitchen will land somewhere in one of them, and a walkthrough is what tells you where.

Kitchen before remodeling, with dated oak cabinets, a black wall oven and the pantry shelving stripped bare
Before
The same kitchen after remodeling: a granite island with globe pendant lights in front of a floor to ceiling wall of white shaker cabinets around the refrigerator and wall oven
After

The breakdown

Cabinets are the line that moves. Everything else is smaller than people expect.

On a typical job the split runs roughly like this:

Part of the jobRough share
Cabinetry and installation28 to 40%
Countertops10 to 25%
Labor, demo and finish carpentry25 to 35%
Appliances3 to 9%
Tile, backsplash and flooring3 to 9%
Plumbing, electrical and permits5 to 8%

Labor stays roughly the same whatever you put in. Cabinetry is the line that moves, which is why a kitchen prices by box count and not by square footage. Two kitchens the same size can be $15,000 or $50,000 in cabinets alone, depending on how many boxes there are and how they are built.

That is also why cost per square foot is close to useless for a kitchen. A galley with twelve boxes and a big open kitchen with twelve boxes cost about the same to fit out, even though one room is twice the size.

The honest part

Five things that change the price, and one that catches people out.

  1. Whether anything moves.

    Keeping the sink, range and fridge where they are is the single biggest lever you have. Moving the sink to a window is one of the most expensive fifteen feet in the house.

  2. How the boxes are built.

    Particle board with a laminate skin, plywood with a face frame, or solid hardwood built for the room. Same footprint, very different number.

  3. What goes on top.

    Level five or six quartz, a waterfall edge, backsplash tile at $25 a square foot, pulls at $12 to $20 each. None of it changes the carpentry underneath and all of it moves the number.

  4. Appliance grade.

    This one is entirely yours to control, and it is the easiest place to spend or save without touching the build.

  5. What is behind the walls.

    Wiring with no ground. Circuits running at the wrong amperage. No insulation. Framing that was never right in the first place. None of it is visible until the cabinets come off the wall, and all of it gets put right before anything new goes back.

The one that catches people out

Two things, and only one of them is the house. Rot, water damage or mold behind the cabinets, which nobody can see until demo day. And changes made after the job has started, usually to the layout, the power or the plumbing. That second one is the expensive kind, because the work has already been done once.

Straight answers

The questions people actually call about.

What does a 10 by 20 kitchen run?

$30,000 to $40,000 if the layout stays put, the cabinets are ordered in rather than built, the floor stays, the countertop is an inexpensive one and the backsplash is new. Appliances not included. The honest answer though is that room size is the wrong question. Ten more feet of cabinet run moves the number far more than ten more feet of floor.

What does it cost just to demo a kitchen?

Demolition and the dumpster run $1,500 to $2,500.

Is $10,000 enough to renovate a kitchen?

In an apartment sized kitchen, with the cheapest MDF cabinets off the shelf, remnant countertop pieces that do not match, no backsplash and the old appliances put back in, maybe. In a normal house of 1,400 to 1,800 square feet, no.

Is $30,000 enough for a kitchen remodel?

For a small 10 by 10 with no layout changes and the appliances reused, it is tight but it can be done. Past that, no.

What is the most expensive part of redoing a kitchen?

Cabinetry. It runs 28 to 40% of a typical job and 40 to 50% when we build the cabinets for the room. People expect it to be appliances or countertops and it rarely is.

How long does it take?

Two to four weeks when the cabinets are ordered in. Seven to ten when we build them. Showrooms quote three to four months for custom. Ours is seven to ten weeks, because the cabinets are built in our own shop instead of waiting in a factory queue.

If the number is higher than you hoped

What to change, and what to leave alone.

Worth doing

Backsplash tile, and the handles and pulls. Both are easy to change later and neither one affects how the kitchen works. The bigger lever is the size of the project. Build around the budget you actually have rather than cutting corners on the parts you cannot reach again.

Not worth it

Electrical, plumbing and framing. All three end up buried behind finished surfaces, so changing your mind later means taking the kitchen apart to get at them.

The things worth saving on are the ones you can change later without tearing anything out. The things worth paying for are the ones buried behind something else.

Included

Things you do not get a separate bill for.

Demolition, the dumpster, plumbing, electrical, framing, drywall, fitting the cabinets and the hardware, connecting the appliances, tiling and painting. The scope is line itemed so it is clear what is included and what is a budget allowance rather than a fixed price.

Worth asking any contractor you talk to the same question, because it is where two quotes that look similar stop being similar.

The last word on numbers

Nobody can price your kitchen from a web page.

Boerne kitchen before remodeling, with a limestone clad bar, granite counters and dark cherry cabinets
Boerne, before
Boerne kitchen after remodeling, with stained wood cabinets, a stainless range hood, double wall oven and a marble topped island
Boerne, after

Everything above is real, and none of it is your number. Two kitchens that look identical in photographs can be thousands apart once you know what is behind the drywall and how many boxes the room actually needs.

What you get from a walkthrough is a real figure. Hayne measures, tells you what the job actually involves, and gives you a timeline in weeks. If the scope does not match the budget, you hear that at the walkthrough rather than after you have committed. The consultation is free and there is no travel charge anywhere we work.

FAQs

Frequently asked questions.

1.

How much does a kitchen remodel cost in San Antonio?

Most kitchens in San Antonio and Bulverde land between $31,500 and $138,000. Where a specific kitchen falls depends mainly on how many cabinet boxes it needs, whether the plumbing or electrical has to move, and what goes on the counters. Published figures for this market vary from under $13,000 to over $125,000, because different sources are describing very different jobs.

2.

Why do kitchen remodel quotes vary so much in San Antonio?

Because a kitchen remodel is not one job. One quote may cover new counters and refinished doors while another covers a full gut with custom cabinetry and a moved wall. Ask any quote what it physically includes: how many cabinet boxes, what they are built from, and whether anything moves.

3.

What is the most expensive part of a kitchen remodel?

Cabinetry, usually 28 to 40% of a typical job and 40 to 50% when the cabinets are built for the room. That is why a kitchen prices by cabinet box count rather than by room size.

4.

Is $30,000 enough for a kitchen remodel?

For a small 10 by 10 with no layout changes and the appliances reused, it is tight but it can be done. Past that, no.

5.

How long does a kitchen remodel take?

Two to four weeks when the cabinets are ordered in. Seven to ten when we build them.

6.

What does it cost to demolish a kitchen?

Demolition and the dumpster run $1,500 to $2,500.

7.

Do you charge for the consultation?

No. The walkthrough and the estimate are free, and there is no travel charge anywhere we work, from Boerne to Universal City and Stone Oak to Spring Branch.